Wednesday, October 04, 2023

MORE TIME OFF

 MONDAY - Need to finish one small peace of flooring in the door way and then  re-hang the door then there are two rips down the side of the stairs and that door to cut and re-hang . I need to re-cut the plinths by the thickness of flooring on the kitchen base units then start putting the edging strips to cover the 10mm space that I left for the floor to expend should it wish .


TUESDAY - All the flooring is done most of the quadrant is on although I do need two more lengths one of the doorways is done with the transition strip in place all the plinths are back on the kitchen base units 

We went to Ikea bought a new rug in brown and new seat covers we also bought rugs for  each the side of the bed .The room looks a lot bigger with the flooring run length ways and should be good for the next ten to fifteen years fingers crossed .Its been hard work and for a cost of around £750 a big improvement .


Helen as mentioned flooring the bedrooms not sure moving the furniture wouldn't be easy specially the wardrobe and side drawers but it could happen .

WEDNESDAY - Glad its mid week looking forward to the weekend already really tired I wish I had booked more days annual leave I have three days to make a long weekend breaking up on the 19th of October .


No comments:

CROSS AND TIRED

 THURSDAY - Today is minus six degrees went out with the dogs this morning it was sunny but ice cold if it gets colder will have to invest i...