MONDAY - Need to finish one small peace of flooring in the door way and then re-hang the door then there are two rips down the side of the stairs and that door to cut and re-hang . I need to re-cut the plinths by the thickness of flooring on the kitchen base units then start putting the edging strips to cover the 10mm space that I left for the floor to expend should it wish .
We went to Ikea bought a new rug in brown and new seat covers we also bought rugs for each the side of the bed .The room looks a lot bigger with the flooring run length ways and should be good for the next ten to fifteen years fingers crossed .Its been hard work and for a cost of around £750 a big improvement .
Helen as mentioned flooring the bedrooms not sure moving the furniture wouldn't be easy specially the wardrobe and side drawers but it could happen .
WEDNESDAY - Glad its mid week looking forward to the weekend already really tired I wish I had booked more days annual leave I have three days to make a long weekend breaking up on the 19th of October .
No comments:
Post a Comment