My good friend Ken helped me , we then went to Wicke"s in the Transit van and bought 16 lengths of timber for the stood work and five eight by four mdf panels to clad both of the sides .
The radiator is going back in situ this coming Monday along with a radiator in the bathroom and the cooked being plumed in on the long wall the fridge is also moving . The electrician is coming back Thursday and the kitchen is getting delivered Friday .
Tomorrow we need to load the trailer pick up more mdf architrave and door casing I also need a wifi extender socket and usb sockets for the bedroom .
The pipe is the only evidence of a heating system for the leg gas
least the tv is back on the wall be it temporary
be warmer when it is cladded and the door is on
The bedroom is now a few feet bigger