Saturday, February 17, 2018

PROGRESS MADE

Started ripping out the walls took out the old leg heating system the walls was ok the plywood paneling came of quite easy .took best part of five hours to get all the timber framing ripped out and dumped in the garden .

My good friend Ken helped me , we then went to Wicke"s in the Transit van and bought 16 lengths of timber for the stood work  and five eight by four  mdf panels to clad both of the sides .
The radiator is going back in situ this coming Monday  along with a radiator in the bathroom and the cooked being plumed in on the long wall the fridge is also moving . The electrician is coming back Thursday and the kitchen is getting delivered Friday .

Tomorrow we need to load the trailer pick up more mdf architrave and door casing I also need a wifi extender socket and usb sockets for the bedroom .

The pipe is the only evidence of a heating system for the leg gas 



least the tv is back on the wall be it temporary 


be warmer when it is cladded and the door is on 


The bedroom is now a few feet bigger 



No comments:

CROSS AND TIRED

 THURSDAY - Today is minus six degrees went out with the dogs this morning it was sunny but ice cold if it gets colder will have to invest i...