Tuesday, March 13, 2007


All the building work is now complete they do have to do a snaging list but apart from that its all done
i did have three days off last week the electrics including the ceiling fan and switches sockets and outside lights was completed along with all the laminate floor in in the new build the living room and kitchen was done.

All in all everything looks well bought a new sony dvd player and a samsung tv in white I built the table and six chairs only four in use the others are in the shed and the cabinet which holds a cd/mp3 player and my wifes laptop dvd player and dvd 's.

we do need more greenery and some other plants and ferns and other odds and sods like a clock ,mirror I'm not sure about perhaps not and some pot ware ornaments etc etc .

we have ordered a brown three seater leather settee and a leather footstool which is a twelve week delivery but that will appear after all the bits and pieces are finished off and some painting is done on the fresh plaster walls and a general good builders clean is completed on the white pvc frames glass and the roof panels the bricks need doing with a acid wash both inside and out and some glazing beads replacing.we need to sort out blinds as well which i know can cost a fortune last time we got blinds for our old conservatory it was £3800 a waste of money what possessed us i don't know. i don't want to spend any where near that amount £600 - £800 max and the less the better ,